-
Use Cases
-
Resources
-
Pricing
Tower Bridge is one of London's most iconic landmarks, a combined bascule and suspension bridge that crosses the River Thames near the Tower of London. Designed by Sir Horace Jones and completed in 1894, it features two Gothic-style towers connected by high-level walkways, with bascules that can be raised to allow river traffic to pass. Today, it remains both a functioning bridge and a popular tourist attraction with a glass-floor exhibition. More Less
1870
% complete
Opened in 1870, Tower Subway was among the world's earliest underground ("tube") railways, but it closed after just three months and was reopened as a tolled pedestrian foot tunnel. Having lost most of its income, the tunnel was closed in 1898.
Image source: Tower Bridge
Dec 1875
% complete
A Special Bridge or Subway Committee chaired by Sir Albert Joseph Altman was formed in December 1875 to find a solution to growing demand for a new river crossing downstream of London Bridge.
Dec 7, 1876
% complete
On 7 December 1876, the Special Bridge or Subway Committee presented a report recommending that a bridge or subway to the east of London Bridge should be constructed, funds permitting.
Jul 24, 1884
% complete
None of the earlier designs gained support, and it was not until 24 July 1884 that the Bridge House Estates Committee brought forward a report proposing "a low level bridge, with mechanical opening or openings" be built.
Oct 28, 1884
% complete
Following a deputation visiting Belgium, Holland, and Newcastle Bridge, a proposal was presented on 28 October 1884 for a mechanical bridge built according to one of three models: Design A, a swing bridge; Design B, a variation of that swing bridge; and Design C, a bascule bridge.
1885
% complete
In 1885 John Wolfe Barry partnered with architect Horace Jones and developed the concept of the "level soffit for the upper bridge", which allowed the design to proceed as it stands today.
Aug 14, 1885
% complete
The act of Parliament authorising construction received royal assent on 14 August 1885 and is called the Corporation of London (Tower Bridge) Act 1885.
Image source: Tower Bridge
Apr 22, 1886 - Jun 30, 1894
% complete
Construction – overseen by Edward Cruttwell – started on 22 April 1886, with the foundation stone laid by the Prince of Wales on 21 June, and took eight years. Cruttwell remained resident engineer throughout construction and stayed associated with the bridge until his death in 1933.
Jun 21, 1886
% complete
The foundation stone of Tower Bridge was laid by the Prince of Wales on 21 June 1886, shortly after construction began in April that year.
Sep 1886 - Jan 1890
% complete
The first caisson was started in September 1886, and it was not until January 1890 that both piers were complete.
1887
% complete
Jones died in 1887, and John Wolfe Barry took over as architect for the remainder of the project.
Feb 1887
% complete
Mr (later Sir) John Jackson won three contracts: the northern approach (started February 1887), the foundations of the piers and abutments (started February 1887), and the cast iron parapet for the northern approach (December 1887), at a total accepted tender cost of £189,732.
Dec 1887
% complete
In December 1887, Sir W. G. Armstrong Mitchell & Co. Ltd was awarded the hydraulics contract for which they tendered £85,232.
Jul 1888
% complete
Mr William Webster was responsible for the southern approach at £38,383, with the contract awarded in July 1888.
May 1889
% complete
Sir William Arrol & Co. had the contract for the metalwork of the superstructure at £337,113 (May 1889), which amounted to about 12,100 tons. Messrs Perry & Co also won two contracts covering the masonry superstructure (May 1889) and paving and lighting (May 1892).
Jun 29, 1893
% complete
The work was not yet complete after extensions granted by the 1889 act, so on 29 June 1893 the Corporation of London (Tower Bridge) Extension of Time Act 1893 received royal assent, granting further time for completion.
Jun 30, 1894
% complete
Tower Bridge was officially opened on 30 June 1894 by Edward, Prince of Wales, and Alexandra, Princess of Wales. The total cost of construction was £1,184,000 (equivalent to £133 million in 2025).
1910
% complete
Since they were only accessible by stairs, the high-level walkways were seldom used by regular pedestrians and were closed in 1910. From the outset in 1894 they had been intended to allow pedestrian movement to continue while the bascule bridge was open for ship traffic.
Dec 6, 1949
% complete
The southern section of the bridge, in the London Borough of Southwark, was Grade I listed on 6 December 1949. The remainder, in Tower Hamlets, was listed on 27 September 1973.
Aug 10, 1912
% complete
On 10 August 1912, pioneering stunt pilot Francis McClean flew his Short Brothers S.33 floatplane between the bascules and the high-level walkways of Tower Bridge.
Aug 3, 1922
% complete
On 3 August 1922, a 13-year-old boy fell off a slipway next to the south side of Tower Bridge.
Dec 30, 1952
% complete
On 30 December 1952, a number 78 double-decker bus was crossing Tower Bridge when it began opening. Driver Albert Edward Gunter accelerated, clearing a 1.8 m (6 ft) drop onto the north bascule, which had not started to rise. He was later rewarded with a £10 bonus (about £246.81 in 2025) for his quick thinking.
Jul 31, 1973
% complete
On 31 July 1973, a single-engined Beagle Pup was twice flown under the pedestrian walkway of Tower Bridge by 29-year-old stockbroker's clerk Peter Martin.
May 1997
% complete
In May 1997, the motorcade of United States President Bill Clinton was divided by the unexpected opening of Tower Bridge.
Aug 19, 1999
% complete
On 19 August 1999, Jef Smith, a Freeman of the City of London, exercised his historic right by driving a flock of two sheep across Tower Bridge.
Oct 31, 2003
% complete
Before dawn on 31 October 2003, a Fathers 4 Justice campaigner climbed a 100-foot (30 m) tower crane near Tower Bridge dressed as Spider-Man at the start of a six-day protest.
May 11, 2009
% complete
On 11 May 2009, six people were trapped and injured after a lift fell 10 feet (3 m) inside the north tower of Tower Bridge.
Aug 9, 2021
% complete
On 9 August 2021, the bridge remained open after a technical failure, causing major disruption to traffic in central London while engineers worked to close it.
1940
% complete
In 1940, the high-level span took a direct hit, severing the hydraulic mechanism and taking the bridge out of action.
Apr 1941
% complete
In April 1941, a parachute mine exploded close to the bridge, causing serious damage to the bascule, towers, and engine room.
1942
% complete
In 1942, a third engine was installed in case the existing ones were damaged by enemy action. The engine became redundant when the rest of the system was modernised in 1974 and was donated to the Forncett Industrial Steam Museum.
1960
% complete
In 1960, the upper bridges of the two pedestrian walkways connecting the two main towers were converted from cantilever bridges, projecting horizontally out into space, to suspension bridges when suspension cables were added.
1972
% complete
Originally hydraulically powered, the operating mechanism was converted to an electro-hydraulic system in 1972. In 1974 the original mechanism was largely replaced by a new electro-hydraulic drive system designed by Geoffrey Beresford Hartwell of BHA Cromwell House, with the original final pinions driven by modern hydraulic motors.
1977
% complete
In 1977 the bridge's colour scheme dated from its repainting in red, white, and blue for Queen Elizabeth II's Silver Jubilee; this scheme lasted until the refurbishment completed in 2010.
1982
% complete
In 1982, the Tower Bridge Exhibition opened, housed in the bridge's twin towers, the long-closed high-level walkways (which reopened that year), and the Victorian engine rooms.
2000
% complete
The bridge closed for a month in 2000 to repair the bascules and perform other maintenance. However, the system proved unreliable afterwards, resulting in the bridge being stuck open or closed on several occasions during 2005 until its sensors were replaced.
Apr 2008 - Mar 2010
% complete
In April 2008, authorities announced a £4 million refurbishment taking four years. From mid-2008 contractors worked on a quarter of the bridge at a time. The walkway interior renovation was completed mid-2009, and the four suspension chains were finished in March 2010 using up to six layers of paint.
Jul 8, 2012
% complete
On 8 July 2012, as part of the London Olympics, the west walkway was transformed into a 200-foot-long (61 m) Live Music Sculpture by British composer Samuel Bordoli. Olympic rings hung from the bridge and were later replaced by the Paralympic emblem.
2014
% complete
In 2014, the pedestrian walkways in each direction were changed to have glass floors, offering visitors spectacular views over the Thames and the road traffic below.
Oct 1, 2016 - Dec 30, 2016
% complete
In 2016, Tower Bridge was closed to all road traffic from 1 October to 30 December for major maintenance work on the structure and its mechanisms.
Or browse the full history timeline directory, with more than 2,000 topics.
This Tower Bridge timeline was generated with the help of AI, using information found on the internet.
We work hard to keep these timelines accurate, but mistakes do get through. If you spot one, email us at [email protected] and we'll fix it for future visitors.
Generate yours with AI or build it from scratch, for free.
Export your timeline, add your own events, edit or remove AI-generated events, and much more
No credit card required.
Cancel anytime.
Cancel anytime.
You can create an unlimited number of timelines with up to 10 events on each one, customize how they look, export them to PDF, PNG, PowerPoint, CSV, and Excel, and share them with a link. Paid plans raise the event limit and add features like spreadsheet imports and collaborators.
Yes. You can cancel your subscription from your account page at any time, and you will not be charged again. Your subscription stays active for the rest of the period you already paid for.
Yes. We will email you a reminder before the annual renewal, and we will also email you a receipt.
Yes. You can email us within 15 days of any payment, and we will issue you a full refund.
Check out our pricing docs or send us an email anytime: [email protected].